Tên lắp đặt : M49
Mã : 19
M49

M49_det1 M49_det2 M49_det3 M49_det4
       
Quantity specification (excl. wastage)
Installation diagram (M49) for Focus E XL in corridors
  Size, mm
  1600x600 1800x600 2000x600 2400x600
1 Ecophon Focus E 1,05/m² 0,95/m² 0,85/m² 0,7/m²
2 Connect T24 Corridor profile, installed at 600 mm centres 1,05/m² 0,95/m² 0,85/m² 0,7/m²
3 Connect Angle trim, fixed at 200 mm centres as required as required as required as required
4 Connect Shadow-line trim, fixed at 200 mm centres as required as required as required as required
5 Connect E-plug (for Shadow-line trim) as required as required as required as required
Min. overall depth of system: 50 mm - - - -